YEAR
|
Aibel
|
|
Glen Lyon
|
Mooring Supervisors
|
Responsible for the inshore Station Keeping and winch Trial
|
|
2016
|
|
Dolwin 2 HVDC
|
OIM Rep
|
Platform Tow and Installation
|
|
2015
|
|
Dolwin 2 HVDC
|
ABB Marine Rep
|
Inclination test, Tow and Installation
|
|
2015
|
|
Petrojarl Knarr FPSO
|
Company Representative
|
Company Representative regarding diving work inshore at Aibel Yard in Haugesund
|
|
2015
|
|
Petrojarl Knarr FPSO
|
Towing Master
|
Towage & Hook-up operation
|
|
2015
|
|
Dolwin 2 HVDC
|
Marine Consultancy
|
Platform Project. Attending in preparation and planning work
|
|
2012-2015
|
Aker Marine Contractors
|
|
Skarv FPSO
|
Tow Master
|
Towing from Stord base, winch testing in Klosterfjord and Offshore Tow and Hook-up operation
|
|
2011
|
Aker Exploration/Det Norske
|
|
Aker Barents
|
Marine representative
|
Marine representatives during rig moves and pre-setting of anchor systems. Risk assessment and chairing hazop prior to projects.
|
ATHS provided by Client
|
2009/2010
|
Boskalis Offshore Marine Contracting
|
|
FPSO “Enquest Producer”
|
Tow Master
|
Offshore Tow and Hook-up Operation
|
|
2015
|
Bukser og Berging
|
|
Gullfaks C
|
Tug Coordinator on Scandi Artic
|
Tug Coordinator during Installation
|
|
2015
|
Bluewater
|
|
FPSO Haewene Brim
|
Tow Master
|
Offshore Tow and Hook-up Operation
|
|
2014
|
Det Norske
|
|
Aker Barents
|
Marine Representative
|
Marine Rep during several rig moves, chairing risk assessment and rig move meetings/Vessels.
-Storklakken
-Pumpaa
-Balder
-Geitfjellet
-Dalsnuten
-Dovregubben
|
AHTS provided by Client
|
2011
|
Doris Engineering
Joint Venture with Solstad
|
|
FPU Alima
Moho Bilondo Field
|
Operation Manager, Tow Master, shift supervisors, deck supervisors and riggers
|
Planning and execution for the mooring installation of suction anchors, chain and spiral stranded wires at 650m depth including Hook-up of the FPU ALIMA, Offshore Congo
|
Temporary Equipment: Åkrehamn Trålbøteri AS
Survey/Positioning: Fugro Survey
ROV services: Fugro Survey
|
2007-2008
|
|
“Farwah” Libya
|
OCM
Offshore Construction Managers
|
Pre-installation of mooring system and Hook-up FPSO, Offshore Libya
|
Temporary Equipment: Åkrehamn Trålbøteri AS
Survey/Positioning: Fugro Survey
ROV services: Fugro Survey
|
2003
|
EMAS-AMC
|
|
Heidrun FSU
|
Tow Master
|
Transport and Installation
|
|
2014
|
Fred Olsen Marine Services/Fred Olsen Production
|
|
Ghana OCTP (FOP)
|
Project Manager
|
Chain replacement FPSO
|
|
2014
|
|
Knock Adoon – Calm Buoy Chain Replacement Antan Field (FOP)
|
Project Manager, Project Engineers, Supervisors, Riggers
|
Procedures and planning
Procurement
Chain Replacement operation
|
Åkrehamn Trålbøteri
|
2013/2014
|
|
Petroleo Nautipa Chain Replacement Project (FOMS)
|
Project Manager, Project Engineers, Supervisors, Riggers
|
All procedures, planning and Installation & rental and purchase of equipment
|
Åkrehamn Trålbøteri (equipment)
|
2013
|
|
Knock Adoon/ Nigeria (FOMS)
|
Project Manager, Supervisors, Riggers
|
All procedures, planning and Installation & rental and purchase of equipment
|
|
2012
|
|
Knock Allan- Hook up and Riser
|
Marine Operations Manager , Tow Master , Assisting Marine operation Manager, Supervisors and Riggers
|
Tow Master and Hook-up of FPSO “Knock Allan” into pre-laid moorings, installation of 4 production risers and umbilical
|
Temporary Equipment: Åkrehamn Trålbøteri AS
Survey/Positioning: Provided by Client
|
2009
|
|
Knock Allan, Olowi Field, Offshore Gabon(FOMS)
|
Marine operation Manager, Supervisors and Riggers
|
Pre-installation, of mooring system
|
Temporary Equipment: Åkrehamn Trålbøteri AS
Survey/Positioning services: Fugro Survey
|
2007-2008
|
|
Knock Taggart/Knock Adoon, Offshore Nigeria (FOMS)
|
Tow Master, Installation Manager, Deck supervisors
|
Installation of anchors, insert of chain, cut loose, Hook-up and related activities including mooring and hook-up of Calm buoy
|
Temporary Equipment: Åkrehamn Trålbøteri AS
Survey/Positioning services: Provided by client
|
2005-2008
|
|
Borgen Dolphin (FOMS)
|
Tow Master
|
Tow Master for the Re-location of Jacket
“Borgen Dolphin” offshore Nigeria
|
Temporary Equipment: Åkrehamn Trålbøteri AS
Survey/Positioning services: Provided by client
|
2003
|
GEMS
|
|
AMR 600 Drill system
|
Mobilization coordinator
|
Mobilisation of the drilling rig AMR-600 and all associated equipment to the Vessel Normand Tonjer
|
|
2010
|
|
Ashdod
|
Marine Consultant
|
Marine Advisor in Ashdod Project in Israel. Port of Ashdod, new container terminal
|
|
2010
|
Global Maritime
|
|
Wellhead cutting campaign
|
Client Representative
|
On behalf of Premier Oil, Petro-Canada and Det Norske. Client Representative on board Skandi Aker during wellhead cutting campaign and removal of suction anchor based template (CAN)
|
|
2011
|
Global Mooring Services (GMSAS)/APL
|
|
Neptune Deep Water Port
|
OCM
Shift Supervisor
|
Phase I: Pre installation of 16 mooring lines including suction anchors, mobilization and demobilization.
Phase II: Pre–Installation of SSW to STL buoy, deployment of STL buoy and diverless connection to pre-laid chain, mobilization and demobilization.
Phase III: Deployment of riser and umbilical and diverless installation to plem and STL buoy, mobilization and demobilization.
|
|
2009
|
|
FPSO Cidade
|
Tow Master
|
Tow Master during the Hook-up of the FPSO Cidade de São Vicente in
the Tupi Field Offshore Brazil, approximately 125 nm South of Rio de
Janeiro.
|
|
2009
|
Grieg Logistics AS
|
|
Jubilee 7951
|
Marine Consultants
|
Sea fastening, calculations, mobilization on site prior to load out and issued certificate of approval for the loading operation.
|
Karmøy Skipsconsult
Sunde Industri & Offshore
|
2009 /2010
|
In Ocean AS/ABB
|
|
Dolwin 2
|
Marine Representative
|
Platform Tow
|
|
2015
|
|
Havila Phoenix
|
Marine Representative
|
|
|
2015
|
|
Thialf
|
Heavy Lift Consultant
|
Attending in planning and preparation work
|
|
2013
|
Karmsund Sevicebase AS
|
|
Safe Caledonia
|
Project Engineer
|
Planning and mooring upon rig arrival, inshore Haugesund
|
|
2015
|
London Offshore Consulting (LOC)
|
|
Åsgard Subsea
|
Marine Warranty
|
Subsea Installations, North Sea Giant
|
|
2014
|
Norwind/VTT
|
|
Alpha Ventus
|
Offshore work manager
|
Installation of 6 wind turbines on the Alpha Ventus farm. German Sector
|
|
2009
|
NSG Maritime
|
|
Jack Bates Kitan
|
Marine Supervisor
|
Pre-set mooring installation, Far Sabre
|
|
2014
|
|
IAG – 1
|
Marine Supervisors
|
Pre-set mooring installation, Far Saracen. Australia
|
|
2014
|
Offshore Installation Group (OIG)
|
|
Orkney Island
Fall of Warness
|
Shift Supervisor
|
Installation of prototype 1MW tidal energy Generator
|
Heavy Lift Vessel Giant 2 provided by Client/OIG
|
2011
|
|
BW Cidade de Sao Vicente
|
Shift Supervisor
|
Shift supervisor during disconnection and reconnection of chain including installation of 6 inch riser, 4 inch service line and umbilical on BW Cidade de Sao Vicente (bow turret) outside of Brazilian coast east of Rio de Janeiro. Water depth approx. 2500m
|
|
2011
|
Oilexco North Sea Ltd
|
|
FPSO Sevan Voyageur
|
OCM/Tow master/Project engineers/Deck foremen/Riggers
|
Tow to field and hook-up to pre-installed moorings incl. Mobilization and demobilization.
Shelley Field UK Sector
|
Temporary Equipment: Åkrehamn Trålbøteri AS
Survey/Positioning: Fugro Survey
ROV services: Fugro Survey
|
2008
|
|
FPSO Sevan Voyageur
|
OCM /Project engineers/Deck foremen/Riggers
|
Second Part of pre-installation mooring system, phase 2
900m of 247mm polyester line including submerged buoy and top chain abandonment incl. Mobilization and demobilization.
Shelley Field UK Sector
|
ROV services: Fugro Survey
Survey/positioning services: Fugro Survey
|
2008
|
RMC AS
|
|
Abidjan
|
Tow Master
|
FPSO BAOBAB Chain Replacement
|
Einarsen Marine Consulting
|
2014
|
Rubicon International
|
|
FPSO “Rubicon Intrepid”
|
Offshore Installation Manager
|
Pre-installation of 9 point mooring prior to hook-up of FPSO “Rubicon Intrepid”. Galoc Field, offshore Philippines
|
AHT`s Vessels chartered by Rubicon/Client
|
2011/2012
|
Sapura Acergy
|
|
Gumusut Kakap FPS
|
Tow Master
|
Offshore construction manager during Hook-up operation.
|
|
2013
|
|
FPS Gumusut-Kakap
|
Marine Consultant
|
Issue Method Statement for Towing and Hook-up.
|
|
2009
|
Semar AS
|
|
FPSO Petrojarl Knarr
|
Tow Master
|
Towmaster for Tow and Hook-up Operation
|
|
2015
|
|
Njård/Norne Mooring Replacement
|
Shift supervisors
|
Shift supervisors during mooring chain replacement Norne/Njord
|
|
2013
|
|
ENI Goliat Anchor Installation
|
Project Engineers
|
Project Engineers during offshore installation
|
|
2013
|
|
ENI Goliat Anchor Installation
|
Project Engineers
|
Planning of operation
|
|
2013
|
|
Scarabeo 3
|
Master Mariner
|
Tow
|
|
2013
|
|
Installation of Wind turbines, Sheringham Shoal
|
Marine Consultancy/Vessel representative
|
Attending in planning and preparation work
UK sector
|
LIG Marine as subcontractor
|
2012
|
|
Sevan Huntington
|
Shift Supervisors
|
Supervisors on board both CHV and Inst. Vessel during Anchor (Suction anchors) installation Huntington Field, Sevan Marine AS
|
|
2011
|
Seth SA Joint Venture with Solstad Offshore
|
|
CLMC Marine Terminal, Madeira
|
Project Manager
|
Installation of mooring system with buoys, anchors and chain for off-loading tankers and installation of PLEM, shallow waters, included planning and preparations
|
|
2004
|
Sevan Marine AS
|
|
Huntington Field UK
|
Shift Supervisors
|
Hook-Up of Voyageur Spirit to preinstalled mooring at Huntington Field
|
|
2013
|
|
Huntington Field UK
|
Project Manager
|
All preparation of Top Assembly equipment onshore and Installation offshore
|
Installation Vessel chartered by Client/Sevan Marine as.
Marine Aluminium as our subcontractor.
|
2012
|
|
Sevan Voyageur
|
Shift Supervisors
|
Shift Supervisor during suction anchor recovery from Shelly field
|
|
2011
|
|
Sevan Voyageur
|
Offshore Construction Manager
|
Recovery trial suction anchors Shelley field
|
AHT “Skandi Skolten” provided by Client
|
2010
|
|
Sevan Voyageur
|
Deck supervisors offshore and Project management for the onshore operation
|
Recovery and Demobilization and storage of mooring equipment (chain, polyester line, connectors and buoyancy elements)
|
Marine Aluminium A/S
Temporary Equipment: Åkrehamn Trålbøteri AS
ATHS provided by Client
|
2010
|
|
Hummingbird and Voyageur
|
Marine Supervisors and riggers
|
Survey and repair of mooring system, replacement of subsea buoys
|
ROV & Survey Provided by Client
|
2009
|
Skeie Rig Management
|
|
Skeie Drilling
|
Tow Master
|
Participating in Jack-up rig trial in Singapore as Tow Master
|
|
2010
|
TVT
|
|
FPSO Berge Helene
|
Shift supervisors
|
Mooring and Hook-up operation
|
|
2013
|
VTT Maritime AS
|
|
Norwind
|
Offshore Work Manager, Supervisor and riggers
|
Pre-piling for wind mills offshore German Coast, German Bight
Alpha Ventus
|
ROV & Survey Provided by Client
|
2009
|
|
FPSO Sevan Voyageur, Oilexco
|
Assisting OCM /Project engineers/Deck foremen/Riggers
|
Pre-installation of mooring system, phase 2
900m of 247mm polyester line including submerged buoy and top chain abandonment incl. Mobilization and demobilization. Shelley Field UK Sector
|
ROV services: Fugro Survey
Survey/positioning services: Fugro Survey
|
2008
|
|
FPSO Sevan Voyageur, Oilexco
|
Assisting OCM /Project engineers/Deck foremen/Riggers
|
Pre-installation, mooring system, phase 1
12 suction anchors from 120t to 140 t including bottom chain incl. Mobilization and demobilization. Shelley Field , UK sector
|
ROV services: Fugro Survey
Survey/positioning services: Fugro Survey
|
2008
|
Westcon
|
|
Vestavind
Havsul Windmill
|
Plan & Budget, Study,
|
Marine Consultant Havsul Study – Wind power
|
|
2011
|
Yinson Production
|
|
Knock Allan
|
Project planning
Tow masters
|
Planning of cut loose operation, and tow to designated location
|
|
Ongoing
|